I began to export a show as a test to svcd format using nuvexport and ma wondering what the average time for a 1 hour show which is about 2.2 gig to convert? I have it going for over an hour and it has only done 17 minutes. My systems is a P3 1.0ghz with 512m ram. Is that what is slowing it down or is this normal? Bryan